EV charging in Borchen
Municipality · 13,682 inhabitants · Medium-sized town, urban area
27charge points with live data
15free right now
€0.64typical price per kWh, AC (12)
€0.69typical price per kWh, DC fast (15)
680EVs registered (KBA)
23.4EVs per public charge point
freeoccupiedout of orderunknown
Cheapest charge points (ad-hoc price, no contract)
| Operator | Address | Charge points | Power | Price per kWh |
|---|---|---|---|---|
| Lidl | Bahnhofstr. 1, 33178 Borchen | 2 | 44 kW | €0.48* |
| Vattenfall InCharge | Sperenberger Str. 1, 33178 Borchen | 2 | 180 kW | €0.49* |
| Citywatt GmbH | Kirchstr. 28, 33178 Borchen | 3 | 180 kW | €0.56 |
| Westfalen Weser Ladeservice GmbH | Hauptstraße 5, 33178 Borchen | 2 | 44 kW | €0.64 |
| Westfalen Weser Ladeservice GmbH | Schloß Hamborn 15, 33178 Borchen | 2 | 44 kW | €0.64 |
| Westfalen Weser Ladeservice GmbH | Stadtweg 52, 33178 Borchen | 2 | 44 kW | €0.64 |
* reported net by the operator, gross price calculated with 19 % VAT. Prices as reported by operators, without guarantee; per-minute prices and idle fees see map.
Fast charging in the Deutschlandnetz
Sites of the nationwide fast-charging network in Borchen:
| Operator | Charge points | Total power | Status |
|---|---|---|---|
| Fastned Deutschland GmbH & Co. KG | 4 | 800 kW | in Betrieb |
| Fastned Deutschland GmbH & Co. KG | 4 | 800 kW | in Betrieb |
Charging at home and on the go
- Power grid: Westfalen Weser Netz GmbH – a home wallbox is registered with this operator.
- Public car parks: 113 with at least 146 spaces (OpenStreetMap)
- Supermarkets: 5 – many offer charging while you shop.
Operator
- Fastned 8
- Westfalen Weser Ladeservice GmbH 8
- Citywatt GmbH 3
- Vattenfall InCharge 2
- Lidl 2
- GETEC mobility solutions GmbH 2
- Betreiber nicht angegeben 2
What is Borchen planning?
1 council document(s) on charging infrastructure in the last two years, latest: „Einrichtung öffentlich zugänglicher Ladeinfrastruktur für Elektrofahrzeuge“.