EV charging in Eberswalde
Town · 41,867 inhabitants · Medium-sized town, urban area
107charge points with live data
49free right now
€0.49typical price per kWh, AC (69)
€0.79typical price per kWh, DC fast (38)
451EVs registered (KBA)
4.6EVs per public charge point
freeoccupiedout of orderunknown
Cheapest charge points (ad-hoc price, no contract)
| Operator | Address | Charge points | Power | Price per kWh |
|---|---|---|---|---|
| Vattenfall InCharge | Freienwalder Str. 48, 16225 Eberswalde | 4 | 180 kW | €0.44* |
| Barnimer Energiebeteiligungsgesellschaft mbH (BEBG) | Goethestr. bei 8, 16225 Eberswalde | 6 | 22 kW | €0.49 |
| Barnimer Energiebeteiligungsgesellschaft mbH (BEBG) | Brunnenstr. 26, 16225 Eberswalde | 2 | 35 kW | €0.49 |
| Barnimer Energiebeteiligungsgesellschaft mbH (BEBG) | Schorfheidestraße / Choriner Straße 16, 16227 Eberswalde | 2 | 44 kW | €0.49 |
| Barnimer Energiebeteiligungsgesellschaft mbH (BEBG) | Rudolf-Breitscheid-Straße 110, 16225 Eberswalde | 2 | 44 kW | €0.49 |
| Barnimer Energiebeteiligungsgesellschaft mbH (BEBG) | Bahnhofsring, 16225 Eberswalde | 2 | 44 kW | €0.49 |
* reported net by the operator, gross price calculated with 19 % VAT. Prices as reported by operators, without guarantee; per-minute prices and idle fees see map.
Fast charging in the Deutschlandnetz
Sites of the nationwide fast-charging network in Eberswalde:
| Operator | Charge points | Total power | Status |
|---|---|---|---|
| Mer Germany GmbH | 8 | 1600 kW | in Bau |
Charging at home and on the go
- Power grid: E.DIS Netz GmbH – a home wallbox is registered with this operator.
- Public car parks: 209 with at least 1.062 spaces (OpenStreetMap)
- Supermarkets: 20 – many offer charging while you shop.
Operator
- Barnimer Energiebeteiligungsgesellschaft mbH (BEBG) 45
- Techem Energy Services GmbH 14
- Vattenfall InCharge 8
- ENBW 8
- E.ON Drive Infrastructure GmbH 8
- GETEC mobility solutions GmbH 8
- Shell Recharge 4
- EWE Go GmbH 4
What is Eberswalde planning?
2 council document(s) on charging infrastructure in the last two years, latest: „Entscheidung zum Standort der Ladesäule für E-PKW“.